Surprise’s hazardous materials management plan, and the storage map in Appendix H.
The City of Surprise adopted the 2024 International Fire Code and took its appendix of plan and inventory instructions in full. That appendix describes a floor plan of each building that holds hazardous materials. RevealBuilt measures the building and draws it.
What Surprise adopted
- The 2024 International Fire Code, with local amendments. The city’s amendments document is dated 1 January 2026.
- Appendix H in its entirety. The amendments adopt the code’s Hazardous Materials Management Plan (HMMP) and Hazardous Materials Inventory Statement (HMIS) instructions without changes.
- No local rewrite of the plan and inventory sections. The amendments do not change Sections 5001.5.1 or 5001.5.2, so the code’s own text applies.
Under that text, a management plan and an inventory statement go in with a permit application where the fire code official requires them. Appendix H also says a facility that has filed a Tier II report is treated as meeting its inventory section.
The drawings
Because Surprise adopted Appendix H whole, its storage map is the format to draw to when the Fire-Medical Department asks for a plan.
The fire code’s site plan. Where a hazardous materials management plan (HMMP) is required, International Fire Code Section 5001.5.1 calls for a facility site plan. Appendix H of the code describes the storage map: a floor plan of each building that holds hazardous materials, on letter-size paper, with north marked and each storage and use area shown, hazardous waste included. It lists:
- Access to each storage and use area
- Emergency equipment
- Where responders meet your liaison
- Evacuation meeting points
- Tanks above and below ground, with their piping
- The hazard classes in each area
- Control areas, Group H areas and exterior storage and use areas
- Emergency exits
The state’s site map. ADEQ states that a site map is mandatory for every facility submitting a Tier II report, showing every way in and out, where substances are stored, and the general layout.
One scan of the building is the base for both drawings.
How RevealBuilt fits
- We scan the building once and draw a measured floor plan and site plan to scale, with north and the drawing date.
- We place what the list calls for that we can see on site: exits, access, emergency equipment, tanks, shut-offs.
- You or your consultant supply the chemical locations, hazard classes and control area boundaries, and we draw them in.
- We do not classify materials, prepare the inventory statement or the management plan, or file anything with Surprise.
A measured site map from one scan of the building is $500 plus $0.05 per square foot scanned, with no travel charge anywhere in Surprise. Map update when storage moves $250. A drawing set made to a fuller HMMP list is quoted by the site before we schedule. For Arizona facilities we also prepare the Tier II report: $995 per facility, up to 30 chemicals.
Which fire code does Surprise use?
The city’s local amendments document, dated 1 January 2026, adopts the 2024 International Fire Code with amendments.
What is Appendix H?
The International Fire Code’s instructions for a hazardous materials management plan and inventory statement. Surprise adopted it in its entirety. It describes the facility storage map: a floor plan of each building holding hazardous materials, on letter-size paper, with north marked.
What does the storage map show?
Storage and use areas including hazardous waste, access to each, emergency equipment, where responders meet your liaison, evacuation meeting points, tanks and their piping, the hazard classes in each area, control areas and Group H areas, and emergency exits.
When is a management plan required in Surprise?
Under International Fire Code Section 5001.5.1, where the fire code official requires one with a permit application. Ask the Surprise Fire-Medical Department before you order drawings.
Does a Tier II report count toward the inventory?
Appendix H says facilities that have prepared and filed a Tier II report are deemed to have complied with its inventory statement section. The fire code official decides what is accepted.
Does the state also want a site map?
If the facility files a Tier II report, yes. ADEQ states that a site map is mandatory with every Tier II report in its system, showing every way in and out, where substances are stored, and the general layout. Whether you must file is a question for ADEQ or your consultant.
Can one scan cover the Surprise drawing and the Tier II site map?
Yes. Both are drawn over the same measured floor plan, so one visit covers both. Your staff or your consultant supplies the chemical locations and hazard classes; we draw them in.
Sources, checked 28 November 2026: City of Surprise Local Amendments to the 2024 International Codes (dated January 1, 2026; 2024 International Fire Code local amendments and adopted appendices); International Fire Code Section 5001.5.1; International Fire Code, 2024 edition, Appendix H (HMMP and HMIS instructions; the copy linked is the one the City of Tucson publishes); ADEQ Tier II Reporting page. The city’s code is the authority and it changes. RevealBuilt measures and draws. It is not a regulator and does not classify chemicals, prepare the HMIS or HMMP, or decide what you must file. For that, ask the Surprise Fire-Medical Department.