Scope a project
Guide · Mesa, Arizona

Mesa hazardous materials reporting, and the floor and site plans it calls for.

The City of Mesa asks businesses that hold hazardous materials above set quantities for an inventory statement (HMIS) and a management plan (HMMP). The plan includes building floor and site plans with a specific list of things to show. RevealBuilt measures the building and draws them.

Who has to file in Mesa

Mesa’s Hazardous Materials Guide says an HMIS and an HMMP are required when the city requests them or when a business exceeds the guide’s reportable quantities in any control area. A facility below every threshold completes only the General Information Form. Some of the quantities:

MaterialReportable above
Corrosive liquid55 gallons
Corrosive gas200 cubic feet
Corrosive solid1,000 pounds
Class I flammable liquid5 gallons inside, 10 gallons outside
Class II and IIIA liquid25 gallons inside, 60 gallons outside
Toxic liquid10 gallons
Toxic solid100 pounds
Oxidizing gas, oxygen included504 cubic feet
Explosives, highly toxic materials, toxic gas, pyrophoricsAny amount
  • This is part of the list. The guide also covers flammable solids and gases, oxidizers by class, organic peroxides, unstable and water-reactive materials, and any hazardous material used in a process such as spray painting, dipping or coating.
  • Thresholds apply per control area. If any one control area is over, the rest of the documents apply.
  • The guide cites the 2024 International Building Code, Section 414, and the 2024 International Fire Code, Chapter 50.

The drawings Mesa asks for

This is where a measured plan earns its keep. The short-form HMMP calls for building floor and site plans, legible and no larger than 11 by 17 inches, showing:

  • Rooms, doorways, corridors and exits
  • The location of each hazardous material and waste, with hazard placards and NFPA 704 labels
  • The outline of every control area
  • The fire alarm panel, the sprinkler riser and the fire department connection
  • The main utility shut-off and the lock box
  • The scale, north direction and drawing date

The long form adds a detailed site map: buildings, exterior storage, loading areas, hydrants and fire protection systems, utility, gas and water shut-offs, tanks and their piping, parking, confined spaces, interior roads, sewers, neighboring uses, access ways, and evacuation and assembly areas, among others.

The state’s Tier II system asks for a site map too, with a shorter list: every way in and out, where substances are stored, and the general layout. One scan of the building is the base for all three drawings.

Illustrative Tier II site map A fictional facility drawn the way a Tier II site map is laid out: the street and two gates, one building with a warehouse, production floor and office, four keyed chemical storage locations, an outdoor tank, utility shutoffs, the fire department connection, a hydrant, a north arrow and a legend. E EXAMPLE ROAD PROPERTY LINE GATE 1 (MAIN)GATE 2 (TRUCKS) OFFICEPRODUCTIONWAREHOUSE DOOR 1DOOR 2DOCKDOOR 3 ABCD EGW FH N LEGEND A Flammable liquids cabinet B Corrosives, drum storage C Battery charging area D Diesel tank, in containment E Electrical main G Gas shutoff W Water shutoff F Fire dept. connection H Hydrant Example Facility (fictional) 0000 E Example Rd Lat 33.0000, Long -111.0000 Drawn 2026-11-15 0 40 80 ft
Illustration only. On a phone, swipe the drawing sideways to see the legend. The facility, address and contents are made up. Your map shows your site, to scale, with the storage locations keyed to the chemicals on your own Tier II report.

How RevealBuilt fits

  • We scan the building once and draw a measured floor plan and site plan to scale, with north and the drawing date.
  • We place what Mesa lists: exits, panels, risers, the fire department connection, shut-offs and the lock box, from what we see on site.
  • You or your consultant supply the chemical locations, hazard classes, NFPA 704 ratings and control area boundaries, and we draw them in.
  • We do not prepare the HMIS or the HMMP, classify materials, or file anything with the city or the state.
What it costs

A measured site map from one scan of the building is $500 plus $0.05 per square foot scanned, with no travel charge anywhere in Mesa. Map update when storage moves $250. A drawing set made to a fuller HMMP list is quoted by the site before we schedule. For Arizona facilities we also prepare the Tier II report: $995 per facility, up to 30 chemicals.

Questions
When does Mesa require an HMIS and an HMMP?

Mesa’s Hazardous Materials Guide says they are required when the City of Mesa requests them, or when a business exceeds the reportable quantities in the guide in any control area. Every facility completes the Hazardous Materials General Information Form, whatever its quantities.

What are some of Mesa’s reportable quantities?

From the guide: corrosives above 55 gallons of liquid, 200 cubic feet of gas or 1,000 pounds of solid; Class I flammable liquids above 5 gallons inside or 10 gallons outside; Class II and IIIA liquids above 25 gallons inside or 60 gallons outside; toxic liquids above 10 gallons and toxic solids above 100 pounds; oxidizing gas at 504 cubic feet, oxygen included. Explosives, highly toxic materials, toxic gas and pyrophoric materials are reportable in any amount. The guide lists more classes than these.

What drawings does a Mesa HMMP need?

The short form calls for building floor and site plans, legible and no larger than 11 by 17 inches, that show rooms, doorways, corridors and exits; the location of each hazardous material and waste with hazard placards and NFPA 704 labels; the outline of every control area; the fire alarm panel; the sprinkler riser; the fire department connection; the main utility shut-off; the lock box; and the scale, north direction and drawing date.

What does the long form add?

A detailed site map. Among the items the guide lists: buildings and structures, exterior storage, chemical loading areas, fire protection systems and hydrants, utility, gas and water shut-offs, tanks above and below ground with their piping, parking, confined spaces, interior roads, storm and sanitary sewers, adjacent property use, access ways, and evacuation and assembly areas.

Which form applies, short or long?

The guide puts the short form at aggregate quantities of 500 pounds or less of solids, 55 gallons or less of liquids, or 200 cubic feet or less of gases. Above those, or for the cases the guide names (a Group H-5 semiconductor facility, a site with several Group H occupancies, or quantities above the fire code’s tables), the long form applies. Mesa decides; ask before you order drawings.

Does Mesa also want a Tier II filing?

The guide’s construction permit checklist includes completing Tier II reporting through the state at azdeq.gov/TierII, updated annually or within 30 days of a change. ADEQ states that a site map is mandatory with every Tier II report in its system.

How are the documents submitted in Mesa?

The guide says the HMIS and safety data sheets go into the city’s DIMES portal as one PDF, separate from the construction plans, and the long-form HMMP goes to Mesa Fire Prevention after construction is complete. The approved HMMP stays on the premises for at least three years.

Can one scan cover the Mesa plans and the Tier II site map?

Yes. Both are drawn over the same measured floor plan, so one visit covers both. We draw what Mesa’s list calls for; your staff or your consultant supplies the chemical locations, hazard classes and control areas.

Sources, checked 28 November 2026: City of Mesa Hazardous Materials Guide (HMMP and HMIS guidance document), which cites the 2024 International Building Code Section 414 and 2024 International Fire Code Chapter 50; Mesa Fire and Medical Fire Code and Supporting Information page; ADEQ Tier II Reporting page. This page lists only some of Mesa’s thresholds; the city’s document is the authority and it changes. RevealBuilt measures and draws. It is not a regulator and does not classify chemicals, prepare the HMIS or HMMP, or decide what you must file. For that, ask Mesa Fire Prevention at (480) 644-2622, or Development Services at (480) 644-4273 for a new business or a construction change.