The City of Buckeye rewrote the fire code’s plan and inventory sections. Where the fire code official requires them, both are filed electronically and updated every year, and the plan includes a facility site plan with its own list of contents. RevealBuilt measures the building and draws it.

What Buckeye changed

Buckeye adopted the 2024 International Fire Code and amended Sections 5001.5.1 and 5001.5.2 in its city code (Section 15-2-10). As amended:

  • Filed every year, or sooner if hazardous material amounts change by more than 10 percent in any single category or overall. That applies to the management plan (HMMP) and the inventory statement (HMIS).
  • Filed electronically, in a format the Buckeye Fire Department accepts.
  • Existing facilities too. The amendment says electronic reporting shall be required for all new and existing facilities upon permit renewal.
  • A Tier II report can serve as the inventory. The HMIS section names a SARA Title III Tier II report as an acceptable statement.

Both documents are required where the fire code official requires them with a permit application; the code does not set one threshold for every business.

What the inventory statement lists

  • Manufacturer’s name
  • Chemical name, trade names and hazardous ingredients
  • Hazard classification
  • Safety data sheet or equivalent
  • UN, NA or CAS identification number
  • Maximum quantity stored or used on site at one time
  • Storage conditions: storage type, temperature and pressure

The site plan Buckeye asks for

As amended, the management plan includes a facility site plan showing:

  • Storage and use areas
  • The maximum amount of each material stored or used in each area
  • The range of container sizes
  • Emergency isolation and mitigation valves and devices
  • Liquid and gas product piping (not utility-owned or low-pressure fuel gas lines)
  • The open and closed positions of self-indicating valves
  • A storage plan showing the storage arrangement, with aisle locations and dimensions
  • The location and type of emergency equipment

The amendment says the plans shall be legible and drawn approximately to scale, and that separate distribution systems may be shown on separate pages.

Aisle locations and dimensions are the part that takes measuring, and in a racked warehouse there are a lot of them. A scan captures the racking as it stands, so the storage plan is drawn from the building and not from memory. The state’s Tier II site map (every way in and out, where substances are stored, the general layout) comes off the same scan.

Illustrative Tier II site map A fictional facility drawn the way a Tier II site map is laid out: the street and two gates, one building with a warehouse, production floor and office, four keyed chemical storage locations, an outdoor tank, utility shutoffs, the fire department connection, a hydrant, a north arrow and a legend. E EXAMPLE ROAD PROPERTY LINE GATE 1 (MAIN)GATE 2 (TRUCKS) OFFICEPRODUCTIONWAREHOUSE DOOR 1DOOR 2DOCKDOOR 3 ABCD EGW FH N LEGEND A Flammable liquids cabinet B Corrosives, drum storage C Battery charging area D Diesel tank, in containment E Electrical main G Gas shutoff W Water shutoff F Fire dept. connection H Hydrant Example Facility (fictional) 0000 E Example Rd Lat 33.0000, Long -111.0000 Drawn 2026-11-15 0 40 80 ft
Illustration only. On a phone, swipe the drawing sideways to see the legend. The facility, address and contents are made up. Your map shows your site, to scale, with the storage locations keyed to the chemicals on your own Tier II report.

How RevealBuilt fits

  • We scan the building once and draw a measured floor plan and site plan to scale, with north and the drawing date.
  • We place what the list calls for that we can see on site: exits, access, emergency equipment, tanks, shut-offs.
  • You or your consultant supply the chemical locations, hazard classes and control area boundaries, and we draw them in.
  • We do not classify materials, prepare the inventory statement or the management plan, or file anything with Buckeye.
What it costs

A measured site map from one scan of the building is $500 plus $0.05 per square foot scanned, with no travel charge anywhere in Buckeye. Map update when storage moves $250. A drawing set made to a fuller HMMP list is quoted by the site before we schedule. For Arizona facilities we also prepare the Tier II report: $995 per facility, up to 30 chemicals.

Questions
How often is a Buckeye HMMP or HMIS filed?

Annually, or more often if hazardous material amounts change by more than 10 percent in any single category or overall, under Buckeye’s amended Sections 5001.5.1 and 5001.5.2.

Does Buckeye require electronic filing?

Yes. Both sections say the document shall be submitted electronically in a format acceptable to the Buckeye Fire Department, and that electronic reporting shall be required for all new and existing facilities upon permit renewal.

What does the Buckeye site plan have to show?

Storage and use areas, the maximum amount of each material in each area, the range of container sizes, emergency isolation and mitigation valves, product piping, valve positions, a storage plan with aisle locations and dimensions, and the location and type of emergency equipment.

Does it have to be to scale?

The amendment says the plans shall be legible and drawn approximately to scale.

Can a Tier II report be the inventory statement?

Buckeye’s amended Section 5001.5.2 names a SARA Title III Tier II report or other approved statement as the HMIS, and lists the information it must include. The fire code official decides what is approved.

Does the state also want a site map?

If the facility files a Tier II report, yes. ADEQ states that a site map is mandatory with every Tier II report in its system, showing every way in and out, where substances are stored, and the general layout. Whether you must file is a question for ADEQ or your consultant.

Can one scan cover the Buckeye drawing and the Tier II site map?

Yes. Both are drawn over the same measured floor plan, so one visit covers both. Your staff or your consultant supplies the chemical locations and hazard classes; we draw them in.

Sources, checked 28 November 2026: City of Buckeye 2024 Construction Codes (October 2024; City Code Section 15-2-10, Fire Code, amending International Fire Code Sections 5001.5.1 and 5001.5.2; the copy linked is hosted by the Arizona Building Officials); ADEQ Tier II Reporting page. The city code is the authority and it changes; confirm the current text with the city. RevealBuilt measures and draws. It is not a regulator and does not classify chemicals, prepare the HMIS or HMMP, or decide what you must file. For that, ask the Buckeye Fire Department.