Tier II site maps for Arizona facilities, ready to upload to myDEQ.
ADEQ now requires a site map with every Tier II chemical inventory report. RevealBuilt draws yours to scale: entrances and exits, where each reported chemical is stored, and the layout of the facility, on a measured floor plan your fire department can read in seconds.
$500 per facility plus $0.05 per square foot scanned: $1,000 for a 10,000 ft² building, $3,000 for 50,000 ft². Yearly update $150. Reports are due March 1. Book the visit by February 12 to be sure of that date.
What the map shows
ADEQ asks for three things. We draw those, plus the items fire departments look for first.
- All points of ingress and egress: site gates, driveways and every exterior door, labeled
- Where substances are stored, inside and outside: each location keyed to the chemicals on your Tier II report, including outdoor tanks and yards
- The general layout of the facility: buildings, main interior areas, loading docks and the property line
- What responders ask for: utility shutoffs, the fire department connection, the nearest hydrant and a responder meeting point, where you want them shown
- The title block: facility name, address, latitude and longitude, north arrow, scale and the date drawn
What it costs
One price rule for every facility: $500 plus $0.05 per square foot of building scanned. Outdoor tanks and yards are drawn from current aerial imagery at no extra charge.
| Building size | Tier II site map |
|---|---|
| 5,000 ft² | $750 |
| 10,000 ft² | $1,000 |
| 25,000 ft² | $1,750 |
| 50,000 ft² | $3,000 |
| 100,000 ft² | $5,500 |
| Yearly update — storage moved, layout unchanged. If the building changed, the changed area is rescanned at $0.05/ft² | $150 |
You receive the Tier II site map as a PDF sized for upload, the measured floor plan as a PDF, and an interactive 3D walkthrough of the building. All of it is yours. This is priced well below our regular as-built schedule because it leaves out the CAD drawing set. Three or more facilities in one order take 10% off. No travel charge anywhere in Maricopa County or within 35 miles of Gilbert (except Wickenburg and Gila Bend, which carry a $250 distance fee).
How it works
- 1. Send the address and your chemical list. Last year’s Tier II report is ideal. We reply with a fixed price.
- 2. We scan and draw. We scan the building with iGUIDE while your escort shows us each storage area, door and shutoff. No shutdown needed.
- 3. You review. One round of corrections is included.
- 4. You upload. Attach the PDF to your Tier II report in myDEQ, or hand it to whoever prepares the report.
What we do, and what we don’t
We draw the map. We do not prepare or certify the Tier II report, classify chemicals, calculate quantities, write your facility emergency response plan or decide whether you have to file. Your Tier II preparer, your environmental consultant and ADEQ do that. Storage locations on the map come from your inventory and from what we see with your escort.
Need the Tier II report prepared? Our sister company SECA has prepared Tier II reports for facilities in all 50 states since 1993. Tier II reporting at SECA.
If you also need dimensioned CAD drawings, for a tenant improvement, an emergency action plan or your fire department’s pre-incident plan, that is our main work: as-built drawings, emergency floor plans and industrial and manufacturing documentation.
Get a fixed price
Tell us how many facilities and where. No call needed.
Is a site map required for an Arizona Tier II report?
Yes. ADEQ states that a site map is now mandatory for every facility submitting a Tier II report in myDEQ, whether or not the facility holds extremely hazardous substances above the threshold planning quantity. Fire agencies and Local Emergency Planning Committees across Arizona asked for it.
What does the Tier II site map have to show?
ADEQ lists three things: all points of ingress and egress, the locations in and around the facility where substances are stored, and the general layout of the facility. ADEQ does not publish a drawing standard, so a clear, to-scale plan with a legend covers it. Your fire department may ask for more, and we add what they ask for.
How much does a Tier II site map cost?
$500 per facility plus $0.05 per square foot of building scanned. That is $750 for 5,000 square feet, $1,000 for 10,000, $1,750 for 25,000 and $3,000 for 50,000. It is well under our regular as-built schedule because you get the floor plan and the Tier II sheet as PDFs, not a CAD drawing set. Three or more facilities in one order take 10% off.
Can I just sketch it myself?
Yes. ADEQ does not require a professional drawing, and a legible hand sketch that shows the three required items can be uploaded. Facilities hire us when they want a to-scale plan that responders can read quickly, that matches the building as it stands, and that is easy to update every year.
Do you file the Tier II report?
No. We draw the site map and send you a PDF ready to upload. You or your Tier II preparer attach it in myDEQ, and your company official certifies the report. We do not classify chemicals, calculate quantities or decide what you must report.
How fast can you turn one around?
Within 5 business days of the site visit. For the March 1 deadline, book the visit by February 12.
We have secure or restricted areas. Does that work?
Yes. Your escort decides where we go and what we photograph. Any area we cannot enter is drawn from your information and labeled that way on the map.
Who sees the map?
You do. We deliver the files to you and do not publish client site maps or use them as samples. Once uploaded, Tier II information is available to your fire agency and Local Emergency Planning Committee through myDEQ.
Who prepares the Tier II report itself?
Not us. Our sister company SECA prepares Tier II reports in all 50 states, and we send reporting questions to them. We draw the site map and the floor plans.
Why scan the building for a site map?
Because the map is only useful if it is right. We scan the building with iGUIDE, so the floor plan under your Tier II sheet is measured, not sketched, and every storage location, door and shutoff sits where it really is. You also get a 3D walkthrough your staff and your fire department can use.
Can we get CAD files too?
Yes. The Tier II price covers the measured floor plan and the Tier II sheet as PDFs. Dimensioned DWG drawings on separated layers are our as-built service, on the regular schedule, and the scan we already took counts toward it.
Sources, checked 15 November 2026: ADEQ Tier II Reporting page; ADEQ “EPCRA & Tier II Reporting” presentation, January 2025; 40 CFR 370.10(b)(2); Town of Gilbert Fire Prevention Regulation 18-5003.4.1 (revised 3/6/2024). RevealBuilt draws the map. It is not a regulator and does not decide what you must report. For that, ask your Tier II preparer or ADEQ’s Tier II line at 602-771-0397 or tier2@azdeq.gov.