Scope a project
For EHS managers & SPCC plan preparers

SPCC facility diagrams drawn from the site as it stands.

A Spill Prevention, Control, and Countermeasure (SPCC) plan must include a diagram of the facility. Tanks get added, drums move and the diagram goes stale. We measure the site and draw a current one for whoever prepares your plan.

What the rule asks for

EPA’s oil pollution prevention rule, 40 CFR Part 112, applies to facilities with more than 1,320 gallons of aboveground oil storage, counting only containers of 55 gallons or more. Section 112.7(a)(3) requires the plan to describe the physical layout of the facility and include a facility diagram. The diagram must mark:

  • The location and contents of each fixed oil storage container
  • The storage area where mobile or portable containers are kept
  • Completely buried tanks, including ones otherwise exempt from the rule
  • Transfer stations and connecting pipes

What we draw

We scan the building with iGUIDE, so the floor plan is measured, not sketched. Then we place what the rule asks for on it.

  • Buildings, yards and the property line, to scale
  • Each tank, tote, drum area, transformer and oil-filled equipment, numbered to match your container list
  • Secondary containment: dikes, berms, double walls and curbing
  • Loading and unloading areas, fill ports and visible piping runs
  • Storm drain inlets and the direction water leaves the site, as your preparer confirms it
E EXAMPLE ROAD GATE 1GATE 2 OFFICEPRODUCTIONWAREHOUSE1234FILLDD LEGEND1 Diesel AST, 2,000 gal dashed line: containment2 Used oil drums, 6 x 55 gal3 Hydraulic oil totes, 2 x 275 gal4 Transformer, 380 galFILL Loading and unloading areaD Storm drain inletDashed arrows Direction of flowContents and capacity from client Example Facility (fictional)Drawn 2026-11-15, not to be usedfor any real building N
Illustration only, of a made-up building. On a phone, swipe the drawing sideways to see the legend. Your drawing shows your building, measured.

What we do, and what we don’t

We draw the diagram. We do not write or certify the SPCC plan, size containment, or decide whether the rule applies. Most plans must be certified by a professional engineer, and the diagram is one part of what that engineer reviews. Contents and capacities on the drawing come from your records.

Price

$500 per building plus $0.05 per square foot scanned: $750 for 5,000 ft², $1,000 for 10,000 ft², $1,750 for 25,000 ft². You receive the drawing and the measured floor plan as PDFs, plus a 3D walkthrough. Updating a drawing we made, when things move, is $150. Dimensioned CAD files are our as-built service on the regular schedule. No travel charge anywhere in Maricopa County or within 35 miles of Gilbert (except Wickenburg and Gila Bend, which carry a $250 distance fee).

Get a fixed price

Tell us the address and roughly how big the building is. No call needed.

We reply within one business day. If the form gives you any trouble, email marcus@revealbuilt.com or call (480) 269-5477.

Questions
Does every SPCC plan need a facility diagram?

Yes. The general requirements for all SPCC plans, in 40 CFR 112.7(a)(3), include a facility diagram.

How often does the diagram need updating?

The plan has to be amended when the facility changes in a way that affects its potential for a discharge, such as adding or moving a tank, and reviewed at least every five years. The diagram should change with it.

Can one visit cover the SPCC diagram and our Tier II site map?

Yes. Both are drawn from the same scan, so the second drawing is priced as an update, not a new job.

Sources, checked 15 November 2026: 40 CFR Part 112, Sections 112.1(d)(2)(ii) and 112.7(a)(3). RevealBuilt measures and draws. It is not a regulator, engineer or licensing consultant, and it does not decide what applies to you. Confirm the requirement with the agency or your consultant before you order.