Stormwater site maps drawn to scale, ready for your plan preparer.
Before an Arizona industrial facility can file for stormwater permit coverage, it needs a Stormwater Pollution Prevention Plan (SWPPP), and the plan needs a site map. We draw the site to scale and place what you store and do outdoors.
What the rule asks for
ADEQ issues the industrial stormwater Multi-Sector General Permit (MSGP), and the 2024 permit is the current one. ADEQ states that a SWPPP must be completed before you submit a Notice of Intent for coverage. Part 5 of the permit sets the plan’s contents, which include:
- A description of the industrial activities at the site
- A general location map
- A site map. ADEQ publishes a SWPPP template and checklist that list what the map should show for your sector
What we draw
We scan the building with iGUIDE, so the floor plan is measured, not sketched. Then we place what the rule asks for on it.
- Buildings, paved and unpaved areas and the property line, to scale from our scan and current aerial imagery
- Outdoor material storage, loading areas, fueling, waste bins and equipment yards
- Storm drain inlets, channels and discharge points we can see on site
- Drainage areas and flow arrows as your preparer directs
- Where your stormwater controls are installed
What we do, and what we don’t
We draw the map. We do not write the SWPPP, determine drainage patterns or receiving waters, choose control measures, or file the Notice of Intent. Flow directions and drainage divides on the drawing are the ones your stormwater consultant gives us or confirms.
$500 per building plus $0.05 per square foot scanned: $750 for 5,000 ft², $1,000 for 10,000 ft², $1,750 for 25,000 ft². You receive the drawing and the measured floor plan as PDFs, plus a 3D walkthrough. Updating a drawing we made, when things move, is $150. Dimensioned CAD files are our as-built service on the regular schedule. No travel charge anywhere in Maricopa County or within 35 miles of Gilbert (except Wickenburg and Gila Bend, which carry a $250 distance fee).
Get a fixed price
Tell us the address and roughly how big the building is. No call needed.
Do all industrial sites need this?
No. The permit covers listed industrial sectors with stormwater discharges to protected surface waters. A site where all industrial activity is under cover may qualify for a No Exposure Certification instead. ADEQ’s stormwater page explains both.
Is this the same as a construction SWPPP?
No. Construction sites fall under a separate Construction General Permit with its own map list. We can draw either.
How often is the map updated?
When the site changes: new storage areas, new paving, moved operations or new controls. A map that no longer matches the yard is a common inspection finding.
Sources, checked 15 November 2026: ADEQ Industrial Stormwater Multi-Sector General Permit; ADEQ SWPPP resources; ADEQ MSGP inspection checklist (Part 5.1.1). RevealBuilt measures and draws. It is not a regulator, engineer or licensing consultant, and it does not decide what applies to you. Confirm the requirement with the agency or your consultant before you order.